NEW QUESTION 75
Which of the following is not included in the hard-loaded standard procedure of the MA5800?
- A. Install the power and ground wires
- B. Installing and tying the fiber
- C. Install the machine frame
- D. Software commissioning
Answer: D
NEW QUESTION 76
What are the correct statements about the seat belt of the vehicle? (Multiple Choice)
- A. Driver training includes how to use seat belts
- B. All company vehicles need to be equipped with seat belts
- C. Seat belt inspection as part of routine maintenance
Answer: A,B,C
NEW QUESTION 77
Regarding the MA5800 frame type equipment, the equipment installation environment quality standards, what are the correct statements? (Multiple Choice)
- A. Customer's PGND cable, GND cable of primary power supply, wire diameter and power supply mode of a 48V cable to PDF or distribution box, subject to engineering design documents and company shipments, to meet equipment operation and capacity expansion requirements.
- B. AC power supply related parameters are in line with the long-term safe operation of the equipment. The equipment room AC power system should have a lightning protection unit, and the lightning protection unit should be grounded reliably.
- C. The AC protection ground of the AC power supply should be reliably connected to the AC protection ground. The GND grounding and PGND grounding provided by the customer must be connected to the same grounding body.
- D. No fire and anti-static measures are required in the equipment room.
Answer: A,B,C
NEW QUESTION 78
All the EXP cascade ports on the storage device can be connected to the PRI cascade port. Otherwise, services will be interrupted.
- A. True
- B. False
Answer: A
NEW QUESTION 79
Which are the correct statements in the SOP interpretation of the MA5800? (Multiple choice)
- A. The DC power supply system of the engine room must have been installed to provide a stable power supply.
- B. Workers need to wear safety helmets and anti-shoes when entering the station.
- C. The installation scenario must be clear: cement floor installation or anti-static floor installation, etc.
- D. The transmission equipment in engine room does not need to be installed.
Answer: A,B,C
NEW QUESTION 80
The front and back floors of the cabinet where the server is installed need to have an open ventilation floor.
- A. False
- B. True
Answer: A
NEW QUESTION 81
For the inspection of PPE, it only needs to be carried out at the site, and it is not necessary to check before departure.
- A. False
- B. True
Answer: A
NEW QUESTION 82
How many hard disks does the RH8100 V3 Type A front IO module support?
- A. 0
- B. 1
- C. 2
- D. 3
Answer: B
NEW QUESTION 83
In the equipment room where the bracket and anti-static floor are installed, the cable can be routed under the cable, and all cables are routed through the floor interlayer or the cable trough. If the upper cable is used, you need to lay a cable tray on the top of the cabinet. The cable is routed through the cable tray.
- A. True
- B. False
Answer: A
NEW QUESTION 84
When the OceanStorV3 series storage is delivered, which is the correct power-on sequence for each device?
- A. Open the external power switch corresponding to each device -> Control box -> Switch -> Application Server
- B. Application Server -> Open the external power switch corresponding to each device -> Control box -> Switch
- C. Switch -> Open the external power switch corresponding to each device -> Control box -> Application server
- D. Control box -> Open the external power switch corresponding to each device -> Switch -> Application Server
Answer: A
NEW QUESTION 85
What is the range of copper wire recommended by Vectoring/SuperVector/G.fast in the FTTC scenario?
- A. 1Km~3Km
- B. 5Km or more
- C. 100m~500m
- D. 500m~1Km
Answer: C
NEW QUESTION 86
What is the high-end storage size of the OceanStor 18000 V3 series (including packaging)?
- A. 2176mm*1000mm*1465mm
- B. 2000mm*6000mm*1232mm
- C. 2176mm*10000mm*1465mm
- D. 2000mm*6000mm*1200mm
Answer: A
NEW QUESTION 87
Regarding the aerial work PPE, which one is the correct statement?
- A. All workers must wear appropriate personal protective equipment when working at height
- B. When working at height, the tower worker can choose any personal protective equipment that he likes to wear.
- C. When working at height, personal protective equipment may not be provided for skilled tower workers.
Answer: A
NEW QUESTION 88
RH5885H V3 PCIE supports hot plugging.
- A. True
- B. False
Answer: A
NEW QUESTION 89
Huawei's recommended grounding resistance must be less than how much ohms?
- A. 0
- B. 1
- C. 2
- D. 3
Answer: C
NEW QUESTION 90
What cable and grounding bar do I need to connect to the MA5800?
- A. Protective ground wire
- B. Upstream fiber
- C. Downstream fiber
- D. DC power cord
Answer: A
NEW QUESTION 91
Which one is not a typical product for copper access?
- A. DSLAM: such as MA5600
- B. MSAN: such as UA5000
- C. ONT: such as HG8145C
- D. DSL terminal: such as HG630
Answer: C
NEW QUESTION 92
When the MA5800 uplink fiber connection is connected, which statements are correct? (Multiple Choice)
- A. Upstream adopts SC type fiber
- B. The fiber needs to be placed in the bellows at the top of the cabinet.
- C. Fiber needs to be tied
- D. One end is connected to the uplink port, and the other end is connected to the corresponding optical port of the ODF frame.
Answer: B,C,D
NEW QUESTION 93
The OceanStor V3 series of next-generation storage products support 240v high-voltage DC input.
- A. False
- B. True
Answer: A
NEW QUESTION 94
Regarding the speed of the car, which one is correct?
- A. Never speeding, you need to speed limit according to roads, conditions and other factors.
- B. When there is no vehicle in front, you can drive at appropriate speed.
- C. Limousine, excellent performance, can speeding
Answer: A
NEW QUESTION 95
In the process of replacing the signal cable and the power cable, the cable connection can be directly implemented according to the cable label. It is not necessary to perform the line sequence check according to the cable route.
- A. False
- B. True
Answer: A
NEW QUESTION 96
About the requirements that OceanStor 18000 series high-end storage requirements for the environment, which is wrong?
- A. It is recommended to adopt the layout of hot and cold air duct isolation.
- B. Can work at various altitudes
- C. There are certain requirements for vibration and shock
- D. It is recommended to use a high efficiency filter to filter the air entering the air center of the data center.
Answer: B
NEW QUESTION 97
Vehicle safety does not need to be checked before each drive.
- A. False
- B. True
Answer: A
NEW QUESTION 98
All new partners must first interview the corresponding project manager and product line technical leader before entering the area, and sign the safety production commitment letter, the network safety behavior red line commitment letter, and receive the supervision certificate before entering the area, new employees do not allow to operate the existing network equipment.
- A. True
- B. False
Answer: A
NEW QUESTION 99
......
Huawei Certified Specialist - Data Center and Network Equipment Hardware Installation (Written) Free Update Certification Sample Questions: https://www.suretorrent.com/H35-912-ENU-exam-guide-torrent.html