Updated Nov-2021 Exam C-TSCM42-67 Dumps - Pass Your Certification Exam [Q37-Q57]

Share

Updated Nov-2021 Exam C-TSCM42-67 Dumps - Pass Your Certification Exam

Latest Real SAP C-TSCM42-67 Exam Dumps Questions


SAP C-TSCM42-67 Exam Syllabus Topics:

TopicDetails
Topic 1
  • Master Data (LDM)
Topic 2
  • Material Requirements Planning (PP-MRP)
Topic 3
  • Material and Capacity Requirements Planning
Topic 4
  • Application Overview and Backgro
Topic 5
  • Lean Manufacturing (PP-REM| PP-KAB)
Topic 6
  • Production Orders Basics (PP-SFC)
Topic 7
  • Production Orders Advanced (PP-SFC)

 

NEW QUESTION 37
Which of the following master data is necessary for the creation of material reservations for production orders?

  • A. Production/resource tools
  • B. Routings
  • C. Material master records
  • D. Production versions

Answer: C

 

NEW QUESTION 38
What do you have to consider when you use SAP ECC long-term planning (LTP)? (Choose two)

  • A. LTP focuses on the operational planning of important components.
  • B. LTP creates purchase requisitions for external procurement.
  • C. A planning scenario must be released before it can be used in LTP.
  • D. Reorder point planned materials can be included in LTP.

Answer: C,D

 

NEW QUESTION 39
What do you have to consider regarding lot size procedures?

  • A. If a long-term lot size is used, procurement is conducted with a long-term perspective.
  • B. The procurement quantity of a lot size procedure can be specified using a safety time period profile.
  • C. If a make-to-order production strategy is used, only the lot-for-lot (exact) lot size can be applied.
  • D. The lot size quantity can be influenced using a minimum lot size and the rounding profile.

Answer: D

 

NEW QUESTION 40
Which of the following elements do you have to prepare for costing of a production order to function without errors? (Choose three.)

  • A. Assign a production scheduling profile to the material master (product).
  • B. Enter formulas for costing in the work center.
  • C. Assign costing variants to order type.
  • D. Propose a standard text key in work center.
  • E. Use an operation control key with the indicator costing-relevant.

Answer: B,C,E

 

NEW QUESTION 41
Which of the following items of master data are needed for repetitive manufacturing? (Choose three)

  • A. Repetitive manufacturing profile
  • B. Product cost collector
  • C. Master record for serial numbers
  • D. Production supply area
  • E. Production version

Answer: A,B,E

 

NEW QUESTION 42
You create a routing that includes five operations in an initial sequence (10, 20, 30, 40, 50). When capacity bottlenecks occur, you want to use a second sequence on other work centers for operations 30 and 40.
Which sequence category do you use to create the second sequence in the system?

  • A. Finish-start relationship
  • B. Parallel sequence
  • C. Alternative sequence
  • D. Standard sequence

Answer: C

 

NEW QUESTION 43
Which of the following functions does SAP Supply Chain Management (SCM) offer?

  • A. Product development, safety, quality, and maintenance
  • B. Communication with customers through different interaction channels
  • C. Planning of supply chains across company boundaries
  • D. Optimization of the procurement strategy with the supplier pool

Answer: C

 

NEW QUESTION 44
An enterprise wants to use SAP ECC requirements planning together with the NETPL procedure (net change planning in the planning horizon). The planning horizon should be set equally for all materials by default.
However, some materials need to have a different planning horizon.
Which procedure do you recommend for setting the planning horizon?

  • A. Set the planning horizon in the MRP groups and assign deviant entries via the plant parameter settings in Customizing.
  • B. Set the planning horizon in the plant parameters in Customizing and assign deviant entries via the MRP groups for the corresponding materials.
  • C. Set the planning horizon in the plant parameters in Customizing and store deviant entries in the material masters for corresponding materials.
  • D. Set the planning horizon in the MRP groups in Customizing and store deviant entries in the material masters for the corresponding materials.

Answer: B

 

NEW QUESTION 45
What do you have to consider regarding ATP checks in SAP ECC that are triggered from customer orders?

  • A. An ATP check creates fixed links between customer orders and their confirmed receipts.
  • B. The ATP quantity is the available quantity that can be used to confirm incoming customer orders.
  • C. If the ATP check determines non-availability, it then checks in the next step whether timely procurement or production is possible.
  • D. The ATP check does not take stocks and receipts into account. It checks consumption of planned independent requirements.

Answer: B

 

NEW QUESTION 46
What are the names of the objects for process integration of production orders? (Choose two)

  • A. PI sheets
  • B. Control instructions
  • C. Work instructions
  • D. Control recipes

Answer: B,C

 

NEW QUESTION 47
The master data for an in-house production process is to be set up in the SAP ECC system. To do this, you should create a suitable routing that plans for five operations in an initial sequence (10, 20, 30, 40, 50). There should be an option of relocating operations 30 and 40 to a second sequence on other work centers if there are capacity bottlenecks. What sequence type would you use to create the second sequence in the system?

  • A. Substitute sequence
  • B. Parallel sequence
  • C. Alternative sequence
  • D. Standard sequence

Answer: C

 

NEW QUESTION 48
When maintaining a work center, formulas can be assigned in the scheduling view. Formulas use formula parameters for calculation.
What can be the origin of the formula parameters used for scheduling? (Choose three)

  • A. Standard values in the operations of routings
  • B. General operation values of routings
  • C. User-defined fields in the operation of routings
  • D. General item values of bill of materials
  • E. General values from work scheduling view of the material master

Answer: A,B,C

 

NEW QUESTION 49
Which types of objects can be changed with Engineering Change Management (ECM)? (Choose three)

  • A. Work center
  • B. Material master
  • C. Task list
  • D. Production version
  • E. Bill of material

Answer: B,C,E

 

NEW QUESTION 50
In which of the following objects can you activate backflushing of components if you want to use this functionality during order confirmation? (Choose three.)

  • A. Production Scheduling Profile
  • B. Material Master (Finished Product)
  • C. Routing
  • D. Material Master (Component)
  • E. Work Center

Answer: C,D,E

 

NEW QUESTION 51
Which of the following situations occur when a production order is set to Technically Complete (TECO)?
(Choose three.)

  • A. Purchase orders for external operations or non-stock materials are deleted.
  • B. Reservations are deleted.
  • C. The order is no longer relevant for Material Requirements Planning.
  • D. The order and its operations receive the system status Locked (LKD).
  • E. Capacity requirements are deleted.

Answer: B,C,E

 

NEW QUESTION 52
Which of the following features are offered by MRP areas in SAP ECC? (Choose two)

  • A. A storage location may be assigned to different MRP areas.
  • B. Make-to-order production is supported by storage location MRP areas.
  • C. Subcontracting is supported by MRP areas.
  • D. An MRP area may include different storage locations.

Answer: C,D

 

NEW QUESTION 53
Which of the following master data can be used with process orders? (Choose three)

  • A. Production/resource tools
  • B. Production versions
  • C. Resources
  • D. Serial numbers
  • E. Master recipes

Answer: B,C,E

 

NEW QUESTION 54
You want to enhance the system statuses of a production order with user statuses.
How do you do this?

  • A. Define the user statuses in the Customizing table of the system statuses.
  • B. Define a status profile in Customizing and assign it to the production scheduling profile.
  • C. Define the user statuses in the order type-dependent parameters.
  • D. Define a status profile in Customizing and assign it to the order type.

Answer: D

 

NEW QUESTION 55
A user you advise wishes to transfer variable process instructions for automated processing directly to certain work centers and machines in the production department (for example, feed speed, pressing pressure, dry temperature). The user also wishes to receive variable as-is messages (such as actual quantities, actual times) from these work centers and machines and to process these messages for feedback concerning production orders. Which of the following options would you recommend to implement these requirements?

  • A. Plant data collection (PP-PDC) interface
  • B. SAP Business Intelligence (BI)
  • C. Execution Steps (XSteps) and process messages
  • D. SAP Application Link Enabling (ALE)

Answer: C

 

NEW QUESTION 56
What master data do you need for material replenishment using the KANBAN procedure? (Choose two)

  • A. Control cycle
  • B. Production supply area
  • C. Product cost collector
  • D. Production version
  • E. Rate routing

Answer: A,B

 

NEW QUESTION 57
......

C-TSCM42-67 Dumps To Pass SAP Certified Application Associate Exam in One Day : https://www.suretorrent.com/C-TSCM42-67-exam-guide-torrent.html