
SAP Application Associate C_TPLM30_67 Dumps | Updated Sep 26, 2021 - SureTorrent
Master 2021 Latest The Questions SAP Application Associate and Pass C_TPLM30_67 Real Exam!
NEW QUESTION 38
What do you use to set up a refurbishment order for external refurbishment?
- A. An external operation that contains a control key for refurbishment.
- B. An order type for external refurbishment and an assignment of a material with split valuation.
- C. An external operation that contains a subcontracting indicator and a material item with a material provision indicator activated.
- D. An order type for external refurbishment and a material item with item category External
Refurbishment.
Answer: C
NEW QUESTION 39
Which of the following steps are required to create a measuring point for performance-based preventive maintenance? (Choose two)
- A. Activate the Measurement Reading Transfer indicator.
- B. Specify the annual estimated usage for the measuring point.
- C. Create the measuring point as a counter.
- D. Define a valuation code group.
Answer: B,C
NEW QUESTION 40
Which scheduling parameter adjusts the cycle intervals of a maintenance strategy for each maintenance plan?
- A. The early and late tolerance
- B. The call horizon
- C. The cycle modification factor
- D. The early and late shift factors
Answer: C
NEW QUESTION 41
A maintenance work order has external processing. The planning plant and maintenance plant have different addresses. A purchase requisition is generated from a maintenance order.
With standard delivered SAP Customizing, which address is the default delivery address in the purchase requisition?
- A. Work center
- B. Maintenance plant
- C. Storage location
- D. Planning plant
Answer: D
NEW QUESTION 42
Which of the following combinations must you use to create a single-cycle maintenance plan for an external service?
Please choose the correct answer.
Response:
- A. A framework order and a maintenance order for settlement
- B. A maintenance order for settlement and an outline agreement
- C. A framework order and a subcontract purchase order
- D. A subcontract purchase order and an outline agreement
Answer: A
NEW QUESTION 43
A file server using an SC7020 storage array was impacted by ransomware in the morning and a majority of the files need to be recovered. The backup from the previous night did not run. Is there anything that can be done on the SC7020 array to help recover these files?
- A. Yes, if there is a snapshot from before the ransomware on the volume(s) were impacted. A View volume can be created from this snapshot and the files recovered.
- B. Yes, if there is a snapshot from before the ransomware on the volume(s) were impacted. Volume(s) can be rolled back to this snapshot.
- C. Nothing can be done on the SC7020 to assist with this recovery.
- D. Yes, if there is a snapshot from before the ransomware on the volume(s) were impacted. A Replay can be created from this snapshot and the files recovered.
Answer: B
NEW QUESTION 44
The maintenance of a technical system comprises the following tasks:
Please choose the correct answer.
Response:
- A. Inspection
- B. Closed system
- C. Evaluation
- D. Construction
- E. Project assistance
Answer: A
NEW QUESTION 45
What are the prerequisites for installing equipment at a functional location?
There are 2 correct answers to this question.
Response:
- A. The equipment category of the equipment allows the installation.
- B. A fixed asset is assigned to the equipment.
- C. A cost center is assigned to the equipment.
- D. The functional location master record allows the installation.
Answer: A,D
NEW QUESTION 46
Which of the following information can the shift report display?
There are 3 correct answers to this question.
Response:
- A. Planned and actual costs for shifts
- B. Measurement documents and goods movements
- C. Maintenance orders and notifications
- D. Digital signatures for approval of a shift report
- E. Maintenance plans and task lists
Answer: B,C,D
NEW QUESTION 47
What are the two options available for archiving order? (Choose two.)
- A. Order settlement
- B. Copy orders
- C. Recognize orders
- D. Refurbishment
- E. Manually enter historical orders
Answer: C,E
NEW QUESTION 48
Factory calendars are assigned to the maintenance plant and work center.
By default, which factory calendar is used for work order scheduling?
- A. Maintenance plant
- B. Planning plant
- C. Main work center
- D. Production work center linked to a technical object
Answer: C
NEW QUESTION 49
Which command is used to assign the DNS server IP address 10.10.10.12on an SC9000 during the initial configuration?
- A. controller dnsserver 10.10.10.12
- B. ifconfig inet 10.10.10.12
- C. controller ipconfig 10.10.10.12
- D. net dns init 10.10.10.12
Answer: D
Explanation:
Explanation/Reference: https://www.dell.com/community/Compellent/Dell-SC4020/td-p/5036791
NEW QUESTION 50
Why should Legacy Port Mode be selected rather than Virtual Port Mode on an SC Series storage array?
- A. Virtual Port Mode does not support ALUA
- B. Legacy Port Mode is easier to set up and more reliable
- C. Virtual Port Mode is difficult to set up
- D. Virtual Port Mode requires NPIV support
Answer: C
NEW QUESTION 51
Your customer wants the system to generate a serial number and an equipment master upon goods receipt of a material.
Which Customizing steps are required?
- A. Create a serializing procedure and assign it to an equipment master.
- B. Create a serial number profile and assign it to an equipment master.
- C. Create a serial number profile and assign it to a view profile for technical objects.
- D. Create a serial number profile and assign it to a serializing procedure.
Answer: D
NEW QUESTION 52
Which location object information is available?
Please choose the correct answer.
Response:
- A. In the notification
- B. Catalog
- C. Field
- D. Editor phase
Answer: A
NEW QUESTION 53
......
A fully updated 2021 C_TPLM30_67 Exam Dumps exam guide from training expert SureTorrent: https://www.suretorrent.com/C_TPLM30_67-exam-guide-torrent.html