[Oct 28, 2021] Pass Your C_TSCM42_67 Dumps Free Latest SAP Practice Tests [Q56-Q78]

Share

[Oct 28, 2021] Pass Your C_TSCM42_67 Dumps Free Latest SAP Practice Tests

Get Top-Rated SAP C_TSCM42_67 Exam Dumps Now


SAP C_TSCM42_67 Certification Exam Topics:

Topic AreasTopic Details, Courses, Books
Material Requirements Planning (PP-MRP) > 12%

Explore material requirements planning functions.

Basics on SAP Business Processes (E-Learnings) < 8%

Outline the scope of SAP SCM business processes.

Material and Capacity Requirements Planning > 12%

Characterize production-relevant planning functionality.

Production Orders Advanced (PP-SFC) > 12%

Configure production order functionality.

Lean Manufacturing (PP-REM, PP-KAB) 8% - 12%

Outline the highlights of repetitive manufacturing and kanban.

Master Data (LDM) 8% - 12%

Set up master data for production planning and manufacturing.

Application Overview and Background < 8%

Characterize the interplay of master data, planning, ATP, and production functionality.

Process Orders (PP-PI) < 8%

Identify specific properties of process orders.

Production Orders Basics (PP-SFC) 8% - 12%

Apply production order functionality.


NEW QUESTION 56
For which of the following objects can you enter a confirmation? (Choose two)

  • A. Trigger Point
  • B. Work Center
  • C. Production order operation
  • D. Production order

Answer: C,D

 

NEW QUESTION 57
Which of the following are properties of ECC Multi-Site Planning? (Choose two.)

  • A. The use of scope of planning (cross-plant total planning) is mandatory for Multi-Site Planning.
  • B. When using two-step stock transport order with delivery, the receiving plant is defined as a customer.
  • C. When using one-step stock transfer posting, transfer stock is created in the receiving plant.
  • D. Both withdrawal from alternative plant and withdrawal from another plant are defined via special procurement keys.

Answer: B,D

 

NEW QUESTION 58
In what sequence are the steps of material requirements planning performed in SAP ECC?

  • A. 1. Net requirements calculation
    2. Lot sizing
    3. Scheduling
    4. Determination of the procurement type
  • B. 1. Net requirements calculation
    2. Lot sizing
    3. Determination of the procurement type
    4. Scheduling
  • C. 1. Calculation of safety stock
    2. Lot sizing
    3. Scheduling
    4. Determination of the procurement type
  • D. 1. Availability check
    2. Lot sizing
    3. Determination of the procurement type
    4. Scheduling

Answer: B

 

NEW QUESTION 59
Which statements are true for ECC Long-Term Planning (LTP)? (Choose two.)

  • A. In case of external procurement, long-term planning creates purchase requisitions.
  • B. A planning scenario must be released to use it in long-term planning.
  • C. Long-term planning generally is operational planning of important components.
  • D. Reorder point planned materials can be included in long-term planning.

Answer: B,D

 

NEW QUESTION 60
You want to produce a finished product only when it is requested by a customer order in make-to-order production. However, all assemblies need to be procured beforehand.
How can you fulfill these requirements in SAP ECC? (Choose two)

  • A. Use strategy 20 (make-to-order production) for the finished product and strategy 70 (planning at the assembly level) for all assemblies in the bill of material.
  • B. Use strategy 50 (planning without final assembly) for the finished product and no strategy for all assemblies in the bill of material.
  • C. Use strategy 40 (planning with final assembly) for the finished product and strategy 70 (planning at the assembly level) for all assemblies in the bill of material.
  • D. Use strategy 30 (production by lots) for the finished product and strategy 70 (planning at the assembly level) for all assemblies in the bill of material.

Answer: A,B

 

NEW QUESTION 61
Which of the following requirements for a manufacturing plant can be supported by using process manufacturing? (Choose three.)

  • A. Manufacturing without orders.
  • B. Master recipe-based manufacturing.
  • C. Manufacturing in charge quantities.
  • D. Material requirements planning for production resources.
  • E. Variable calculation of material quantities (product output, material usage).

Answer: B,C,E

 

NEW QUESTION 62
What master data do you need for material replenishment using the KANBAN procedure? (Choose two)

  • A. Control cycle
  • B. Production supply area
  • C. Product cost collector
  • D. Production version
  • E. Rate routing

Answer: A,B

 

NEW QUESTION 63
What do you have to consider when you use SAP ECC long-term planning (LTP)? (Choose two)

  • A. LTP focuses on the operational planning of important components.
  • B. LTP creates purchase requisitions for external procurement.
  • C. A planning scenario must be released before it can be used in LTP.
  • D. Reorder point planned materials can be included in LTP.

Answer: C,D

 

NEW QUESTION 64
What features related to process orders can be used to fulfill Good Manufacturing Practices (GMP) requirements? (Choose three)

  • A. Availability check
  • B. Resource selection
  • C. Digital signature
  • D. Electronic batch record
  • E. Approved master recipes

Answer: C,D,E

 

NEW QUESTION 65
Which property applies for consumption with planning strategy 40 (planning with final assembly)?

  • A. Consumption can reduce the total originally planned production quantity.
  • B. Consumption can increase the total originally planned production quantity.
  • C. Consumption takes place with the planning material.
  • D. Consumption creates a static and binding assignment between the planned independent requirements and the customer requirements for the entire procurement process.

Answer: B

 

NEW QUESTION 66
What do you have to consider regarding consumption? (Choose two)

  • A. Consumption is restructured with the planning run.
  • B. Consumption takes place on the material level between the planned independent requirements and the planned orders.
  • C. Consumption parameters (consumption mode and consumption interval) can be set in the material master or in the MRP group.
  • D. Consumption can take place between order reservations and planned independent requirements, depending on the strategy.

Answer: C,D

 

NEW QUESTION 67
In the SAP ECC system, a material is produced using production orders. The planning table for repetitive manufacturing should be used to plan line loading for this material. On the initial screen of the planning table, you select this material and then receive a message informing you that you cannot use the planning table for this material (see attached screenshot).

What could be the reason?

  • A. There is no valid production version for this material.
  • B. The repetitive manufacturing indicator has been set.
  • C. There are no requirements present.
  • D. There are no planned orders or production orders present.

Answer: A

 

NEW QUESTION 68
What do you have to consider regarding ATP checks in SAP ECC that are triggered from customer orders?

  • A. An ATP check creates fixed links between customer orders and their confirmed receipts.
  • B. The ATP quantity is the available quantity that can be used to confirm incoming customer orders.
  • C. If the ATP check determines non-availability, it then checks in the next step whether timely procurement or production is possible.
  • D. The ATP check does not take stocks and receipts into account. It checks consumption of planned independent requirements.

Answer: B

 

NEW QUESTION 69
When testing requirements planning in plant 1000, you receive the error message displayed below. Large numbers of materials are already available in plant 1000. As a first step in solving the problem, you activate requirements planning in the Customizing for plant 1000.

What further tasks do you perform before you can use requirements planning in plant 1000 in SAP ECC?

  • A. Set up the planning files in Customizing and specify the plant parameters for plant 1000 in Customizing of the MRP group.
  • B. Activate requirements planning in Customizing for MRP areas in plant 1000 and specify the plant parameters for plant 1000 in the MRP views in material master.
  • C. Set up the planning file in Customizing and specify the plant parameters for plant 1000 in the MRP views in material master.
  • D. Set up the planning file in Customizing and specify the plant parameters for plant 1000 in Customizing.

Answer: D

 

NEW QUESTION 70
What do you have to consider, when you use the ATP (Available To Promise) checks for material? (Choose two)

  • A. ATP checks can be adjusted to also consider future requirements and receipts.
  • B. ATP checks are automatically performed during Material Requirements Planning (MRP) runs.
  • C. ATP checks are mandatory for lead-time scheduling.
  • D. ATP checks can be carried out automatically when releasing a production order.
  • E. ATP checks are used to evaluate the free capacity on a certain work center.

Answer: A,D

 

NEW QUESTION 71
Which types of objects can be changed with Engineering Change Management (ECM)? (Choose three)

  • A. Work center
  • B. Material master
  • C. Task list
  • D. Production version
  • E. Bill of material

Answer: B,C,E

 

NEW QUESTION 72
In the Customizing for requirements planning, a project team notices that the alternatives P1, P2, P3 and P4 are also delivered as standard in addition to MRP type PD. The number in each of these alternatives represents a firming type.
What does a firming type define? (Choose two)

  • A. Handling existing procurement proposals outside the planning time fence.
  • B. Handling existing procurement proposals within a planning time fence.
  • C. Handling new procurement proposals that need to be created due to new requirements within the planning time fence.
  • D. Handling new requirements within the planning time fence.

Answer: B,C

 

NEW QUESTION 73
What data can be posted directly via the Plant Data Collection (PP-PDC) interface?

  • A. Maintenance notifications
  • B. Goods issues
  • C. Confirmations
  • D. Goods receipts

Answer: C

 

NEW QUESTION 74
Which of the following statements best defines SAP ERP?

  • A. SAP ERP is an application that supports all processes involving direct customer contact throughout the entire customer relationship life cycle.
  • B. SAP ERP is a system hardware that includes components such as Purchasing, Sales and Distribution, Materials Management, and Production.
  • C. SAP ERP is a system in which advanced planning and optimization processes can be mapped.
  • D. SAP ERP is an application that a company can use to manage its business processes efficiently.

Answer: D

 

NEW QUESTION 75
You want to reduce the uncertainty caused by fluctuating requirements for a finished product by using a dynamic safety stock in SAP ECC.
On which specifications is the dynamic safety stock calculation based?

  • A. The static safety stock and the material forecast
  • B. The average daily demand and the desired range of coverage
  • C. The static safety stock per day and the safety time
  • D. The average daily demand and the safety time

Answer: B

 

NEW QUESTION 76
During the processing of production orders planned and actual costs are determined.
On which of the following objects can you collect these costs? (Choose two)

  • A. Planned order
  • B. Product cost collector
  • C. Work center
  • D. Production order

Answer: B,D

 

NEW QUESTION 77
Which of the following properties about the planning functions available in SAP ECC applies?

  • A. Material requirements planning (MRP) includes automatic capacity leveling.
  • B. Long-term planning (LTP) is a long-term form of forecasting.
  • C. Master production scheduling (MPS) refers to preferred planning of important materials.
  • D. In demand management (DM) material shortage situations are identified and corresponding receipt elements are created.

Answer: C

 

NEW QUESTION 78
......

Passing Key To Getting C_TSCM42_67 Certified Exam Engine PDF: https://www.suretorrent.com/C_TSCM42_67-exam-guide-torrent.html